ENI - OYO Field Development Scope of Work
Discovered in 1995, Oyo is one of the first oilfields to be discovered off the coast of Nigeria. The Federal Republic of Nigeria leased OML 120 block for oil mining in 2002. The appraisal wells were drilled between 2006 and 2007. Initial production from two wells began in December 2009. The associated gas from the wells is reinjected through a third well to increase oil recovery and reduce flaring.
Client |
Allied Energy / ENI / CAMAC International |
Fabrication Location |
Keppel Fels, Singapore |
Install Location |
West Africa |
Start - Completion |
2008 - 2009 |
Project Description
|
» |
40,000 BOP/D and 60 MMSCF/D FPSO |
» |
Water Injection & Gas Lift/Injection |
» |
Project Management for CAMAC / Allied |
» |
Worked directly with partner ENI / NAE |
» |
Scope of Work continually increased |
» |
Oversight / design review of FPSO topsides design by Bumi Armada (KL) and DPS (UK)
|
» |
Interface management between partners Allied, ENI, NAE and CAMAC and their vendors
◦ Bumi Armada - FPSO
◦ Aker - subsea
◦ Technip - flowlines
|
» |
Fast track project with First Oil achieved on December 15, 2009
|
» |
WJM continued to provide technical support |
|
Scope of Work |
Validated detail design. Specific activities included:
» |
Surveyed and Inspected FPSO Candidate (Romania). |
» |
Evaluated Technical Bid(s). |
» |
Interface Design between subsea company, flexible flowlines, ship's system ad topsides design. |
» |
HAZOP review in U.K. / Indonesia. |
» |
Design review in Singapore and Italy. |
» |
Onsite construction surveillance in Singapore. |
» |
ABS interface coordination in Kuala Lumpur. |
» |
Review / approval of vendor drawings. |
» |
Review / approval of P&ID's. |
|
Project Manager |
John Weaver / Fred Weikert / Peter Cutt |
|